Abdirad, H and Dossick, C S (2019) Normative and descriptive models for COBie implementation: discrepancies and limitations. Engineering, Construction and Architectural Management, 26(08), 1820–36.

Almarri, K, Alzahrani, S and Boussabaine, H (2019) An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(08), 1696–711.

Anson, M, Ying, K T and Siu, M F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(08), 1672–95.

Antwi-Afari, M F, Li, H, Wong, J K, Oladinrin, O T, Ge, J X, Seo, J and Wong, A Y L (2019) Sensing and warning-based technology applications to improve occupational health and safety in the construction industry. Engineering, Construction and Architectural Management, 26(08), 1534–52.

Au-Yong, C P, Chua, S J L, Ali, A S and Tucker, M (2019) Optimising maintenance cost by prioritising maintenance of facilities services in residential buildings. Engineering, Construction and Architectural Management, 26(08), 1593–607.

Charkhakan, M H and Heravi, G (2019) Evaluating the preventability of conflicts arising from change occurrence in construction projects. Engineering, Construction and Architectural Management, 26(08), 1777–800.

Gao, J, Ren, H, Ma, X, Cai, W and Shi, Q (2019) A total energy efficiency evaluation framework based on embodied energy for the construction industry and the spatio-temporal evolution analysis. Engineering, Construction and Architectural Management, 26(08), 1652–71.

He, Q, Wang, T, Chan, A P, Li, H and Chen, Y (2019) Identifying the gaps in project success research. Engineering, Construction and Architectural Management, 26(08), 1553–73.

Hilali, A, Charoenngam, C and Barman, A (2019) Barriers in contractual scope management of international development projects in Afghanistan. Engineering, Construction and Architectural Management, 26(08), 1574–92.

Hopkin, T, Lu, S, Sexton, M and Rogers, P (2019) Learning from defects in the UK housing sector using action research. Engineering, Construction and Architectural Management, 26(08), 1608–24.

Jin, R, Zou, Y, Gidado, K, Ashton, P and Painting, N (2019) Scientometric analysis of BIM-based research in construction engineering and management. Engineering, Construction and Architectural Management, 26(08), 1750–76.

Liang, R and Chong, H (2019) A hybrid group decision model for green supplier selection: a case study of megaprojects. Engineering, Construction and Architectural Management, 26(08), 1712–34.

  • Type: Journal Article
  • Keywords: Case study; Supply chain management; Strategic management; Decision support systems;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-10-2018-0462
  • Abstract:
    Green supplier selection is one of the crucial activities in green supply chain management. However, limited studies have addressed the vagueness and complexities during the selection process, particularly in multi-criterion decision-making (MCDM) circumstances. Hence, the purpose of this paper is to develop a group decision model using a modified fuzzy MCDM approach for green supplier selection under a complex situation. Design/methodology/approach The proposed study develops a framework for sorting decisions in green supplier selection by using the hesitant fuzzy qualitative flexible multiple attributes method (QUALIFLEX). The synthetic consistent or inconsistent indexes were used to calculate all alternative suppliers by normalizing the hesitant fuzzy decision matrix. Findings The proposed framework has been successfully applied and illustrated in the case example of CB02 contract section in Hong Kong–Zhuhai–Macau Bridge project. The results show various complicated decision-making scenarios can be addressed through the proposed approach. The synthetic (in)consistent indexes are able to calculate all alternative suppliers by normalizing the hesitant fuzzy decision matrix. Originality/value The research contributes to improving accuracy and reliability decision-making processes for green supplier selection, especially under vagueness and complex situations in megaprojects.

Murillo, K P, Rocha, E and Rodrigues, M F (2019) Construction sectors efficiency analysis on seven European countries. Engineering, Construction and Architectural Management, 26(08), 1801–19.

Park, E, Kwon, S J and Han, J (2019) Antecedents of the adoption of building information modeling technology in Korea. Engineering, Construction and Architectural Management, 26(08), 1735–49.

Rajagopalan, G (2019) Durability of alumina silicate concrete based on slag/fly ash blends against corrosion. Engineering, Construction and Architectural Management, 26(08), 1641–51.

Silverio-Fernandez, M A, Renukappa, S and Suresh, S (2019) Evaluating critical success factors for implementing smart devices in the construction industry. Engineering, Construction and Architectural Management, 26(08), 1625–40.